Field reference: protected cases awaiting handling. It illustrates packing context and does not prove a specific order’s release status.

Field reference: a loading scene. It shows dispatch coordination, not a guaranteed shipping date or carrier commitment.

Field reference: cases inside a vehicle. It is a logistics reference and not evidence of a particular customer shipment.
The final service step is where commercial completion and operational coordination meet. For an overseas used LED order, payment should not be treated as a separate event that disconnects the customer from the physical batch. Once the agreed commercial requirements are complete, Stellux confirms the order status, coordinates packing and dispatch, and keeps the final documents associated with the product batch and shipping arrangement. The exact payment method, ratio, delivery time, and after-sales period must come from an approved commercial agreement; this SOP does not invent them.
The first priority is clarity. The customer should know what status has been reached and what the next coordination action is. “Payment received,” “order confirmed,” “packing in preparation,” and “dispatch coordination” can describe different points in a process, so the team should use the company’s approved terms consistently. If a payment or document is still under review, that status should remain visible. The aim is to prevent a customer from assuming that a shipment is ready simply because a commercial message has been sent.
The second priority is reference continuity. The final order record should still point to the product identity, batch identity, final quantity, accessory list, inspection or release status, and destination. This matters because the physical items may be handled by several people after the customer has approved the order. The packing team needs to know what belongs in the cases. The dispatch team needs to know what has been counted. The customer needs to know which documents refer to the shipment. A clear reference makes those handovers easier.
The third priority is document completeness within the approved scope. Depending on the project, the customer may need a final count, accessory reconciliation, packing information, inspection evidence, photographs, or dispatch records. The content should be based on the real batch and the actual documents that exist. It should not be padded with invented certificates, warranty language, stock quantities, or delivery claims. If a document has not been confirmed, mark it as pending rather than creating a reassuring sentence.
The fourth priority is packing coordination. The released cabinets and accessories should be reconciled before they leave the controlled preparation area. Protective cases, wooden cases, or another agreed method should match the handling and transport arrangement. The public page does not need to claim that one packaging type is always used. It can explain that the packaging choice and loading record are part of the handover. Photographs can show the physical principle: cases are protected, counts are checked, and the load is secured.
The fifth priority is communication. International dispatch can involve a buyer, a receiving warehouse, a freight partner, a local installer, and a technical contact. The order confirmation should identify the communication route approved for the project. If the destination or receiving contact changes, the record should be updated before dispatch coordination continues. This is not about promising a date. It is about reducing the chance that a correctly packed batch arrives at the wrong contact or cannot be connected to the project.
The final step should also respect the difference between evidence and expectation. A product photograph from a project archive may show a successful installation. It cannot prove that the current batch has the same condition, quantity, configuration, or destination. A dispatch photograph can show a protected load. It cannot prove that the load has been accepted by a carrier or that a border process has completed. Keeping these distinctions in the final message protects the customer from reading more into an image than it can support.
For overseas buyers, this disciplined close is practical. It gives procurement a clear commercial status, gives technical staff a batch reference, and gives logistics a final count and contact path. It also makes later questions easier to answer. If a customer asks which accessories were included, the answer should be in the order record. If the customer asks whether the batch passed the quality path, the answer should point to the release evidence. If the customer asks about transport timing, the team should refer to the actual agreed arrangement instead of repeating a generic website statement.
S06 is therefore not a rushed “thank you” message. It is the last service gate before the product leaves the team’s direct control. The work is complete when the commercial requirements are confirmed, the order status is understandable, the released quantity and accessories are reconciled, the packing and dispatch contact are clear, and the documents remain connected to the physical batch.
That approach supports the Stellux idea of a documented second life. The customer is not asked to trust a label alone. The customer can see the path from product question to batch selection, technical review, quality preparation, release, and handover. When a detail is confirmed, say so. When it is still pending, keep it visible. A clear final confirmation is more useful than a stronger promise that the evidence cannot support.


